File #: ID-545-20    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 11/17/2020 In control: City Council
On agenda: 12/15/2020 Final action:
Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, ACCEPTING THE BID OF VELOCITY CONSTRUCTORS INC. AND AWARDING THE CONTRACT FOR THE NON-POTABLE POND PUMP STATION, PROJECT #20-006492, TO VELOCITY CONSTRUCTORS INC. IN THE AMOUNT OF ONE MILLION ONE HUNDRED FORTY EIGHT THOUSAND EIGHT HUNDRED FIFTEEN DOLLARS ($1,148,815), AND AUTHORIZING THE CITY MANAGER TO SIGN THE CONTRACT ON BEHALF OF THE CITY AND THE CITY CLERK TO ATTEST THERETO
Attachments: 1. Non-pot Pond Rehab Reso, 2. Non-Pot Pond Presentation Final, 3. 545 PPT

Department of Utilities

Reference:                     Award of Formal Solicitation for #20-006492 Non-Potable Pond Pump Station

 

To:                                                               Mayor Gregory Mills and Members of City Council

Through:                                          Jane Bais DiSessa, City Manager

Prepared By:                                          Brett Sherman, Director of Utilities

                                                               Sarah Graves, Utilities Project Engineer

Date Prepared:                     11/2/2020                     

 

PURPOSE

Requesting City Council approval of a formal solicitation for Project #20-006492 Non-potable Pond Pump Station to the most responsive and responsible bidder, and approving the resolution giving the City Manager authority to sign the contract.  Municipal Code Section 3.08.090, “. . . . All bids and proposals in excess of $50,000 shall be awarded through formal written procedures by the City Council.” 

BACKGROUND/HISTORY

A critical component of the City of Brighton’s municipal water system is a non-potable facility that is used to supply water to irrigate various parks throughout the city. There are operational issues with the current facility that have prompted the design of a rehabilitation project. These issues include: sediment buildup from the Fulton Lateral in the pond, inefficient pump placement within the wet well, ineffective backwash discharge location, and lack of access to intake structures for repair or maintenance.  

 

The scope of the project includes:

                     Construction of a new wet well

                     Placement of a pre-packaged pump station skid

                     Electrical work to connect pre-packaged pump station to existing electrical

                     Construction of new access ramp, intake structures and back wash line.

 

Eight (8) formal bids were received on November 2, 2020 at 11:00 AM.  The proposals were received by the Procurement & Contracts Division, and then transferred to the Utilities Engineering group for review.

 

The eight (8) firms submitting bids:

 

Glacier Construction Co. Inc.

$1,642,165.00

HPM, Inc.

$1,139,714.00

Moltz Construction, Inc.

$1,356,423.00

Myers and Sons, LLC

$1,019,600.00

RN Civil Construction

$1,535,700.00

T. Lowell Construction, Inc.

$1,484,000.00

Velocity Constructors, Inc.

$1,148,815.00

Aslan Construction, Inc.

$1,656,491.00

 

FINANCIAL IMPACT

Sufficient funding was approved in the 2020 budget for Utilities infrastructure projects.  The proposal from Velocity Constructors Inc. is within the budgeted amount.

 

STAFF RECOMMENDATION

In completing the review and evaluation of this bid the recommendation is to award to the most responsive and responsible bid of Velocity Constructors Inc. in the amount of a total and not to exceed One Million One Hundred Forty Eight Thousand Eight Hundred and Fifteen Dollars ($1,148,815). 

 

Velocity Constructors Inc. is in good standing with the State of Colorado.

OPTIONS FOR COUNCIL CONSIDERATION

Ø                     Approval as presented 

Ø                     Reject

Ø                     Require new bids be prepared

 

Attachments:

Ø                     Resolution