Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, APPROVING THE CONSTRUCTION AND REIMBURSEMENT AGREEMENT REGARDING THE SABLE OUTFALL CHANNEL AND AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE THE REIMBURSEMENT AGREEMENT ON BEHALF OF THE CITY
Attachments: 1. RESO 25 Sable Outfall_Reimbursement_Agreement, 2. Sable Outfall Reimbursement Agreement_Farmlore_Final_Patrially Executed, 3. Sable Outfall Reimbursement Agreement_Farmlore- CC Presentation_Final
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Department of Utilities

Reference:                     CONSTRUCTION AND REIMBURSEMENT AGREEMENT REGARDING THE SABLE OUTFALL CHANNEL

 

To:                                                               Mayor Gregory Mills and Members of City Council

Through:                                          Michael P. Martinez, City Manager

Prepared By:                     Scott Olsen, Director of Utilities

Date Prepared:                     November 1, 2025

PURPOSE
Requesting City Council’s approval of a resolution authorizing the City Manager, or designee, to execute a reimbursement agreement between the City and Farmlore, LTD. for construction costs related to a portion of the Sable Outfall regional stormwater system.

 

BACKGROUND

The Sable Outfall system will serve existing and future development in the City, including the Sable Boulevard improvements, Farmlore Development and approximately 500 acres of the Prairie Center Development.

 

The City has already designed the piped portion of the Sable Outfall that will carry flow under the Fulton Ditch as part of the Sable Boulevard improvements project and Farmlore has designed the regional sanitary sewer interceptor required for their development. In order to realize potential cost savings and reduce the impact to the traveling public in the vicinity, the City and Farmlore, LTD. wish to enter into a reimbursement agreement. Farmlore’s contractor will construct the piped portion of the Sable Outfall concurrent with the installation of the sanitary sewer interceptor.

 

Construction of both utilities was publicly bid and Three Sons Construction was selected as the contractor. City staff and consultants have reviewed the anticipated construction costs proposed by Three Sons Construction and concur with said costs.

 

The City and Mile High Flood District have partnered to finalize design of the remainder of the Sable Outfall and construction is anticipated next year. The Sable Outfall will flow to the north adjacent to Sable Boulevard and connect with the existing South Outfall at the 148th Avenue alignment.

 

FINANCIAL IMPACT

Sufficient appropriation exists in the 2025 and 2026 budget for reimbursement of the construction costs.  

 

 

STAFF RECOMMENDATION

City staff recommend approval of the resolution as drafted, authorizing the City Manager, or designee, to execute the reimbursement agreement.

 

OPTIONS FOR COUNCIL CONSIDERATION

                     Approve resolution as drafted

                     Approve a modified resolution

                     Deny resolution

                     Provide further direction to staff

 

ATTACHMENTS

                     Resolution

                     Partially-executed Reimbursement Agreement

                     PowerPoint presentation