File #: ID-148-22    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 4/8/2022 In control: City Council
On agenda: 4/19/2022 Final action:
Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, ACCEPTING THE PROPOSAL OF BOWMAN CONSULTING GROUP, LTD. FOR THE CONTRACT AMOUNT OF TWO HUNDRED FORTY-SIX THOUSAND TWO HUNDRED NINETY DOLLARS ($246,290.00) FOR STANDBY GENERATORS AND AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE THE CONTRACT ON BEHALF OF THE CITY
Attachments: 1. PCD Engineering, 2. Well Site Standby Generators, 3. 148 PPT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Department of Utilities

Reference:                      Approving the procurement of 22-007217 Well Site Standby Generators                     

 

To:                                                               Mayor Gregory Mills and Members of City Council

 

Through:                                          Michael Martinez, City Manager

 

Prepared By:                                          Kelsey Archuleta, Procurement Specialist

                                   Marc Johns, Interim Utilities Director

 

Date Prepared:                     March 17, 2022

 

 

PURPOSE

Requesting City Council’s approval of the procurement for 22-007217 Well Site Standby Generators by awarding a contract to Bowman Consulting Group, Ltd., d/b/a PCD Engineering Services, the most responsive and responsible bidder, and approving the resolution giving the City Manager, or designee, authority to sign the contract.  Per City Code Section 3-8-90, “All materials, supplies, equipment, service and construction contracts, except as otherwise provided in this Article, with an estimated cost of greater than fifty thousand dollars ($50,000.00), shall be awarded through the formal bid process or the formal RFP process by the City Council. After due notice inviting bids, purchase orders and contracts shall be awarded to the lowest responsive and responsible bidder.”

 

STRATEGIC FOCUS AREA

Financially Responsible

Supportive, Sustainable Infrastructure

 

BACKGROUND

The City of Brighton will be adding standby generators to six crucial service areas currently without a backup source of power, including four well sites, the Greensand Treatment Plant and the North Water Storage site. The generators will supply temporary, emergency power in the event of a power failure.  These generators will be supplied by natural gas and operate on automatic switches to activate with minimal disturbances to water supply during power outages.

 

FINANCIAL IMPACT

Sufficient appropriation exists for the project.

 

STAFF RECOMMENDATION

Staff recommends that the City Council approve the request to issue an award to PCD Engineering as the lowest, most responsive and responsible proposer. 

 

OPTIONS FOR COUNCIL CONSIDERATION

                     Approve as presented 

                     Reject

                     Require new proposals be prepared

 