Skip to main content
File #: ID-291-25    Version: 1 Name:
Type: Informational Report Status: Agenda Ready
File created: 11/21/2025 In control: City Council
On agenda: 12/9/2025 Final action:
Title: Mile High Flood District (MHFD) IGA Regarding North Outfall Phase III
Attachments: 1. IGA-251038 North Outfall Phase 3 Brighton v.2 (COB 11.20.25)_Legistar, 2. MHFD IGA_North Outfall Phase III- SS Presentation_Final
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Department of Utilities

Reference:                     Mile High Flood District (MHFD) IGA Regarding North Outfall Phase III

 

To:                                                               Mayor Gregory Mills and Members of City Council

Through:                                          Michael P. Martinez, City Manager

Prepared By:                     Scott Olsen, Director of Utilities

Date Prepared:                     November 18, 2025

PURPOSE
Requesting City Council’s approval of a resolution authorizing the City Manager, or designee, to execute an intergovernmental agreement (IGA) between the City and MHFD regarding the North Outfall Phase III.

 

BACKGROUND

The North Outfall system is a regional drainage system that serves the area near Bridge and Telluride Streets. Runoff carried by the system originates from the Bridge Street Widening improvements, Preserve Subdivision, Pheasant Ridge Subdivision, Eagle Ridge Academy, and, in the future, from the Rec Plex.

 

The City has designed and constructed portions of the North Outfall over many years in numerous phases. There are two remaining phases of the project that remain:

                     North Outfall Phase III: connection from regional detention and water quality pond at Eagle Ridge Academy to Bridge Street

                     North Outfall Phase IV: connection of Rec Plex to regional pond at Eagle Ridge Academy

 

Both of these remaining phases are being designed and constructed as part of the Rec Plex project. Per the IGA, MHFD will reimburse the City for design and construction of a portion of Phase III that is regional and master planned.

 

MHFD will contribute $75,000 in 2025 to reimburse the City and is anticipated to contribute an additional $600,000 in 2026 as reimbursement. The City’s Rec Plex project will cover the remainder of the design and construction costs for the outfall and is responsible for procuring a contractor for construction. The City will also be responsible for construction management, which has always been anticipated as a part of the Rec Plex project.

 

FINANCIAL IMPACT

Sufficient appropriation exists in the 2025 and 2026 budget for the City’s contribution to the project as defined in the IGA.   

 

STAFF RECOMMENDATION

At a future City Council meeting, City staff recommend approval of the resolution as drafted, authorizing the City Manager, or designee, to execute the reimbursement agreement.

 

OPTIONS FOR COUNCIL CONSIDERATION

                     Approve resolution as drafted

                     Approve a modified resolution

                     Deny resolution

                     Provide further direction to staff

 

ATTACHMENTS

                     Draft IGA

                     PowerPoint presentation