Skip to main content
File #: ID-233-17    Version: 1 Name:
Type: Informational Report Status: Agenda Ready
File created: 6/6/2017 In control: City Council
On agenda: 6/13/2017 Final action:
Title: Wastewater Master Plan Presentation
Attachments: 1. Sanitary Master Plan with Appendices.pdf, 2. Brighton Wastewater Master Plan2017.06.05.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Body

Department of Utilities

Reference:                      Wastewater Master Plan Presentation

 

To:                                                               Mayor Richard N. McLean and Members of City Council

 

Through:                                          Clint Blackhurst, Acting City Manager

                                                               Chontel Trujillo, Assistant City Manager of Operations

 

Prepared By:                                          Curtis Bauers, Director of Utilities
Date Prepared:
                     June 5, 2017

PURPOSE
To review with City Council the results of the past 18 months of Wastewater Master Planning efforts, and to present the completed Plan for their understanding.  Further, to remind City Council of the efforts of staff and our consultant, Martin & Martin, to examine, review, develop, and promote wastewater solutions for the City of Brighton.

BACKGROUND

As you know, the wastewater master plan has not been updated in over a decade.  Over the past 18 months or so, we have completed mapping of the existing system and have run the dynamic models to show where there are constraints in the existing system, either currently or based on future anticipated flows.  One of the main benefits of this master plan is the identification of those locations and the ability to plan the Capital Improvements necessary to correct those problems in the necessary timeframe.  These ideas, as well as the basics behind the Master Planning process, will be discussed.

The plan considers the City’s Comprehensive Growth Plan and is able to anticipate appropriate sizing of lines for future needs, allowing us to hopefully avoid the need to replace lines in the future with larger lines simply because they were originally installed too small.  The Master Plan also includes Capital Improvement Planning of existing trouble-spots that require regular jetting in order to flow properly; allowing for either point repairs of the problems or proper sizing and improved sloping in a future improvement. 

Additionally, the Plan reviews the existing treatment plants (Brighton, Lochbuie, and Metro) and provides commentary on capacities and planning for these plants. 

The goal of this Study Session is to notify Council that the Master Plan is complete at this time.  As this is a dynamic document we do not recommend formal ‘adoption’ of the Plan, but rather ‘acceptance’, which would allow it to remain dynamic in nature.  As a reminder, this is the technical document supporting the required infrastructure and treatment capacities to construct the future wastewater requirements of the build-out of the City; it is not the actual Capital Improvement Plan to accomplish that build out, but it provides to critical information needed to establish the appropriate CIP.