File #: ID-458-20    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 9/22/2020 In control: City Council
On agenda: 10/6/2020 Final action:
Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, ACCEPTING THE BID OF W.L. CONTRACTORS AND APPROVING THE PROCUREMENT OF 144TH & SABLE TRAFFIC SIGNAL CONSTRUCTION, PROJECT #20-006440, TO W.L. CONTRACTORS FOR THE CONTRACT AMOUNT OF THREE HUNDRED NINETY THOUSAND EIGHT DOLLARS. ($390,008.00), AND AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO SIGN THE CONTRACT ON BEHALF OF THE CITY AND THE CITY CLERK TO ATTEST THERETO
Attachments: 1. 144th TS Resolution.pdf, 2. Revised 144th PP.pdf, 3. 458 PPT

 

Department of Finance - Division of Procurement & Contracts

                Reference: Approving the procurement of 144th & Sable Traffic Signal

Project #20-006440

 

To:                                                               Mayor Gregory Mills and Members of City Council

Through:                                          Jane Bias DiSessa, City Manager

Prepared By:                     Amber Gibbs, Procurement & Contracts Manager

                                   Christopher Montoya, Public Works Engineering Manager

Through:                                          Michael Woodruff, Director of Infrastructure

Date Prepared:                     September 15, 2020

PURPOSE
Requesting City Council approval of formal solicitation for project #   20-006440 to the most responsive and responsible bidder, and approving the resolution giving the City Manager, or Designee, authority to sign the contract.  Municipal Code Section 3.08.090, “…All bids and proposals in excess of $50,000 shall be awarded through formal written procedures by the City Council.” 

 

BACKGROUND/HISTORY

Sable Blvd. is a former state highway segment that the City of Brighton took ownership around 2011. Along the corridor, there are arterials and collector roadways that connect to Sable Blvd. Over time as traffic grows with the growth of the City and surrounding areas, traffic signals become warranted to control the orderly flow of traffic and to enhance intersection safety. The work consists of installing underground infrastructure, traffic signal poles, obtaining power, installing controllers, associated traffic equipment, roadway striping, and all other work that is inherent to complete the construction.

Three (3) formal bids were received on September 9, 2020 at 10:00 AM.  The bids were opened and read into the record by the Procurement Specialist at a public bid opening.

The three (3) firms submitting bids are:

                                          W.L. Contractors, Inc.

                                          Morton Electric, Inc.

                                          Sturgeon Electric Company, Inc.

FINANCIAL IMPACT

Sufficient appropriation exists for the project. 

 

 

STAFF RECOMMENDATION

The Finance Department, in working with the Public Works Department and completing the review and evaluation of this bid, the recommendation is to award to the most responsive and responsible bid to perform the required services of W.L. Contractors, Inc., in the amount of Three Hundred Ninety Thousand Eight Dollars ($390,008.00). 

 

W.L. Contractors, Inc. is in good standing with the State of Colorado. 

 

 

OPTIONS FOR COUNCIL CONSIDERATION

Ø                     Approval as presented 

Ø                     Reject

Ø                     Require new proposals be prepared

 

Attachments:

Ø                     Resolution

Ø                     Bid Abstract