File #: ID-171-15    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 6/30/2015 In control: City Council
On agenda: 7/21/2015 Final action:
Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, ACTING BY AND THROUGH ITS WASTEWATER ENTERPRISE, ACCEPTING THE BID OF LAYNE INLINER, LLC, AND AWARDING THE CONTRACT FOR THE 2015 SEWER LINE REHABILITATION CURED IN PLACE PIPE (CIPP) BID #15-030, TO LAYNE INLINER, LLC IN AN AMOUNT NOT TO EXCEED TWO MILLION THREE HUNDRED TWENTY ONE THOUSAND TWO HUNDRED FIFTY DOLLARS ($2,321,250.00), AND AUTHORIZING THE MAYOR TO SIGN THE CONTRACT ON BEHALF OF THE CITY, AND AUTHORIZING THE CITY MANAGER TO APPROVE CHANGES TO THE CONTRACT AMOUNT UP TO TEN PERCENT (10%) OF THE ORIGINAL CONTRACT AMOUNT
Attachments: 1. 15-030 Resolution for 2015 CIPP, 2. 15-030 Bid Abstract

Body
Department of Utilities
Reference: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, ACTING BY AND THROUGH ITS WASTEWATER ENTERPRISE, ACCEPTING THE BID OF LAYNE INLINER, LLC AS THE LOWEST MOST RESPONSIVE AND RESPONSIBLE BIDDER, AWARDING THE CONTRACT FOR 2015 SEWER LINE REHABILITATION CURED IN PLACE PIPE (CIPP), BID #15-030, TO LAYNE INLINER, LLC IN AN AMOUNT NOT TO EXCEED TWO MILLION THREE HUNDRED TWENTY ONE THOUSAND TWO HUNDRED FIFTY DOLLARS ($2,321,250), AUTHORIZING THE MAYOR TO SIGN SAID CONTRACT ON BEHALF OF THE CITY, AND AUTHORIZING THE CITY MANAGER TO APPROVE CHANGES TO THE CONTRACT AMOUNT UP TO TEN PERCENT (10%) OF THE ORIGINAL CONTRACT AMOUNT.

To: Mayor Richard N. McLean and Members of City Council

Through: Manuel Esquibel, City Manager

Prepared By: Finance Dept/ Division of Procurement Contracts & Risk
Utilities Department

Through: Chontel Trujillo, Assistant City Manager of Operations
Curtis Bauers, Utilities Director

CC: Dan Frelund, Finance Director

Date Prepared: June 30, 2015

PURPOSE

Requesting City Council approval of a resolution:
* Accepting the formal bid from Layne Inliner, LLC as the lowest, most responsive and responsible bidder for the 2015 Sewer Line Rehabilitation Cured in Place Pipe (CIPP) project
* Authorizing a contract with Layne Inliner, LLC for the Cured in Place Pipe (CIPP) project, Bid #15-030
* Giving the Mayor authority to execute such contract, and
* Authorizing the City Manager to approve changes to the contract amount up to ten percent (10%) of the original contract amount.

BACKGROUND

CIPP is a process of lining sanitary and stormwater sewer pipes with a cured-in-place lining. The lining can correct minor problems within degrading pipes and significantly increase the expected life of the pipe. This method is much less expensive than replacing existing pipes; however, it can slightly limit the capacity of the ...