Department of Utilities
Reference: Lupton Meadows Engineering Services During Construction
To: Mayor Gregory Mills and Members of City Council
Through: Michael P. Martinez, City Manager
Prepared By: Scott Olsen, Director of Utilities
Date Prepared: September 15, 2026
PURPOSE
Requesting City Council’s consideration of a contract amendment to the Lupton Meadows Reservoir Design Services contract between the City of Brighton and Engineering Analytics, Inc. in the amount of $1,171,024 for Engineering Services During Construction.
BACKGROUND
City Council previously approved a design contract with Engineering Analytics, Inc. for the Lupton Meadows Reservoir improvements. That original design contract anticipated a contract amendment for Engineering Services During Construction. It is typical in the industry to contract with the Engineer of Record (EOR) for such services due to liability and design interpretation reasons.
At this time, the Issue for Bid (IFB) civil plan set has been completed. City Council also previously approved a Purchase and Sale Agreement (PSA) related to the Lupton Meadows Reservoir outlining an exchange of water bank credits for ownership of the property, certain water rights and $17M toward construction costs for the project.
Engineering Services During Construction are required to ensure the reservoir project is built per the design and functions appropriately. The scope of the services include, but are not limited to:
Final design phase services not previously contracted:
Ft. Lupton Special Use Permit application support
Erosion protection alternatives for cost savings
Coordination on regional trail with Ft. Lupton
Pre-bid Services:
Bid document support and review
Bid question response support
Issue for Construction (IFC) civil plan set and final specifications
Construction phase services:
Progress meetings
Requests for Information (RFIs) and submittal review
Construction oversight
As-built documentation
The use of reservoir water sto...