File #: ID-278-17    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 7/25/2017 In control: City Council
On agenda: 8/1/2017 Final action:
Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, ACTING BY AND THROUGH ITS WATER ACTIVITY ENTERPRISE, ACCEPTING THE BID OF J3 ENGINEERING CONSULTANTS, AND AWARDING THE CONTRACT FOR THE BASELINE ROAD WATER LINE DESIGN PROJECT #98703, IN AN AMOUNT NOT TO EXCEED EIGHTY-NINE THOUSAND SEVEN HUNDRED TWENTY-ONE DOLLARS ($89,721.00), AND AUTHORIZING THE MAYOR TO SIGN THE CONTRACT ON BEHALF OF THE CITY AND THE CITY CLERK TO ATTEST THERETO
Attachments: 1. Resolution, 2. Evaluation Matrix - Baseline Rd(Totals)

 

Body

Reference:    Award of Formal Solicitation Baseline Road Water Line Design RFP# 17-041

 

 

To:                                                               Mayor Richard N. McLean and Members of City Council

 

Through:                                          Clint Blackhurst, Acting City Manager

 

Prepared By:                                          Curtis Bauers, Director of Utilities

 

Through:                     Chontel Trujillo, Assistant City Manager Operations

                                                                                    

Date Prepared:                     July 24, 2017

 

PURPOSE

Requesting City Council approval of a formal solicitation for the Baseline Road Water Line Design to the most responsive and responsible bidder, and approving the resolution giving the Mayor authority to sign the contract.  Municipal Code Section 3.08.090, “. . . . All bids and proposals in excess of $50,000 shall be awarded through formal written procedures by the city council.” 

BACKGROUND/HISTORY

After completing the comprehensive Water Master Plan, it was determined that a new transmission line connecting the water storage tanks to the core city would provide a great benefit to the City. This new line will add redundancy to the existing system and provide additional distribution capabilities and capacity for future development. The scope of work consists of:

 

                     Plan sets at 60% and 90% design levels to be submitted to the City for review

                     Development of a Storm Water Management Plan and ESC plan for the construction

                     Construction plan set ready for bid

                     Engineers Opinion of Probable Construction Costs

                     All applicable survey and potholing along the water line

                     All necessary easements, permitting, and legal descriptions

                     Monthly progress meetings

 

 

An Optional Pre-Bid Conference was held at City Hall on June 28, 2017.

 

Eight (8) formal bids were received on July 17, 2017 at 10:00 AM.  The proposals were received by the Procurement group and then transferred to the Utilities Engineering group for review and ranking.

 

Firms submitting proposals:

 

Ø                     Farnsworth Group

Ø                     IBI Group

Ø                     Drexel, Barrell & Co.

Ø                     Landmark Engineering LTD.

Ø                     Professional Engineering Consultants

Ø                     J.R. Engineering

Ø                     J3 Engineering Consultants

Ø                     Burns & McDonnell

 

 

FINANCIAL IMPACT

Sufficient funding was approved in the 2017 budget for several distribution line purchase and install projectsThe proposal from J3 Engineering Consultants is within the budgeted amount.

 

STAFF RECOMMENDATION

In completing the review and evaluation of this bid the recommendation is to award to the lowest most responsive and responsible bid of J3 Engineering Consultants in the amount of a total not to exceed Eighty-Nine Thousand Seven Hundred Twenty-One ($89,721.00). 

 

J3 Engineering Consultants is in good standing with the State of Colorado.

OPTIONS FOR COUNCIL CONSIDERATION

Ø                     Approval as presented 

Ø                     Reject

Ø                     Require new bids be prepared

 

Attachments:

Ø                     Resolution

Ø                     Bid Abstract