File #: ID-99-18    Version: 1 Name:
Type: Informational Report Status: Agenda Ready
File created: 3/19/2018 In control: City Council
On agenda: 3/27/2018 Final action:
Title: Be Brighton Comprehensive Plan: 2018 Annual Review Update
Attachments: 1. Annual Review Update_Joint SS Pres_Agenda Ready
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Body

Department of

Reference:                      Be Brighton Comprehensive Plan: 2018 Annual Review Update

 

 

To:                                                               Mayor Kenneth J. Kreutzer and Members of City Council

                                                               Chairman Chris Maslanik and Members of Planning Commission

Through:                                          Holly Prather, AICP, Community Development Director

                                   Marv Falconburg, AICP, Assistant City Manager

                                   Philip Rodriguez, City Manager

Prepared By:                                          Aja Tibbs, Long Range Planner

Date Prepared:                     February 23, 2018

 

PURPOSE

To present the 2018 Annual Review of the Be Brighton Comprehensive Plan.

 

BACKGROUND

The Be Brighton Comprehensive Plan was adopted by the Planning Commission on March 22, 2016 and ratified by the City Council on April 4, 2016.  Chapter 5 addresses plan implementation and maintenance procedures of the plan, which include the requirement for an annual review.  Each annual review shall evaluate the City’s progress towards the four community vision themes established during the public engagement process completed in 2016.  In order to strive towards a transparent and data-based report, there are twelve measurements known as “plan indicators” which are linked to each theme.  The four themes and their related indicators are as follows:

 

The Regional Leader for the Northeast Metro Area

                     Brighton’s Share of the Northeast Metro Jobs

                     Brighton’s Share of the Northeast Metro Housing

                     Brighton’s Share of the Northeast Metro Sales Tax

                     Balanced Employment

 

Inclusive Community Where we Collaborate and Share

                     Life Cycle Housing Options

                     Walkable Blocks

                     Core Area Connectivity

 

A Sustainable and Complete Community

                     Access to Parks

                     Residential Water Use & Sustainable Projects

 

A Future Rooted and Growing in a Shared Heritage and Home Town Feel

                     Historic Resources Stewardship

                     Downtown Vibrancy and Availability

                     Open Space and Agricultural Land Conservation

 

Although staff will perform a review of each of the indicators on an annual basis, it is not expected that all of the goals will be met each year.  The Comprehensive Plan notes that it may take five to ten years to see a clearly defined pattern trending towards the desired goal.

 

STAFF FINDINGS

This is the second annual review performed by staff using the adopted plan indicators.  Analysis of each indicator will be reported for the 2017 year, with minor data modifications as directed by the Planning Commission and City Council upon last year’s presentation and initial data collection.  Changes made this year will be as follows:

 

Indicator #3 - Brighton’s Share of Northeast Metro Sales Tax.

                     In absence of an appropriate data source for sales tax collected within the metro area boundary, staff has gathered tax information for surrounding communities in whole and performed an analysis of comparison and growth trends.

 

Indicator #7 - Core Area Connectivity

Staff has generated a database for sidewalks and trails within the city core. New sidewalks, trails and bike lanes outside of the city core have also been listed for reference.

 

Also new this year, staff is creating a trend analysis, which demonstrates the overall change that has occurred since plan adoption.  This will be particularly beneficial as we look for trends in the data over time.  As previously mentioned, it may take 5 to 10 years to see some if the indicators trend in the desired direction.  

 

STATUS UPDATE

Staff is currently wrapping up the data collection and analysis stage of the annual review. The final pieces of data are expected to be released in late March. Once the analysis is complete, staff will draft a final report of the indicators for internal and external use in strategic and annual budget planning.  The plan will also be published on our website for public consumption, as well as presented to the Planning Commission, City Council and any others Boards or Commissions upon request.

 

ATTACHMENTS

                     Study Session Presentation