File #: ID-150-22    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 4/15/2022 In control: City Council
On agenda: 5/3/2022 Final action:
Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, ACCEPTING THE PROPOSAL OF OLSSON, INC. FOR THE DESIGN OF THE KEN MITCHELL CELL 1 GRAVITY LINE AND SUMP PUMP DRAIN LINE IMPROVEMENTS, PROJECT #502042, IN THE CONTRACT AMOUNT OF SEVENTY-SIX THOUSAND EIGHT HUNDRED FIFTY-NINE DOLLARS ($76,859.00), AND AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE AND SIGN THE CONTRACT ON BEHALF OF THE CITY
Attachments: 1. Olsson, 2. 2022-05-03 Presentation KM Cell 1 Gravity Line Sump Pump CC, 3. 150 PPT
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Department of Utilities
Reference: Approving the procurement of 20-006478 Ken Mitchell Cell 1 Gravity Line and Sump Drain Line Design Improvements

To: Mayor Gregory Mills and Members of City Council
Through: Michael Martinez, City Manager
Prepared By: Kelsey Archuleta, Procurement Specialist
Austin Creswell, Water Resource Engineer

Date Prepared: April 15, 2022
PURPOSE
Requesting City Council approval for the procurement of 20-006478 Ken Mitchell Cell 1 Gravity Line and Sump Drain Line Design Improvements by awarding a contract to Olsson, Inc., deemed the most responsive and responsible bidder of the two (2) received in response to the posted solicitation, and approving the resolution giving the City Manager, or designee, authority to sign the contract. Per City Code Section 3-8-90: "[a]ll materials, supplies, equipment, service and construction contracts, except as otherwise provided in this Article, with an estimated cost of greater than fifty thousand dollars ($50,000.00), shall be awarded through the formal bid process or the formal RFP process by the City Council. After due notice inviting bids, purchase orders and contracts shall be awarded to the lowest, most responsive and responsible bidder."

STRATEGIC FOCUS AREA
Financially Responsible
Supportive, Sustainable Infrastructure

BACKGROUND
Formal Bids were requested from qualified engineers for the design of flow meter structures to be installed on the two existing gravity intake pipelines that run from the City's Ken Mitchell Cell 1 diversion structure on the South Platte River to the Cell 1 reservoir. These proposed water measurement structures will measure water diverted from the South Platte River to the Cell 1 reservoir and are vital to the City's water augmentation system. The diversion structure and reservoir inlets are shown on the Site Map in Figure 1, below. The Colorado Division of Water Resources (Office of the State Engineer) requires the installation of flow measurement devices i...