Title: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRIGHTON, COLORADO, ACCEPTING THE PROPOSAL OF JR ENGINEERING, LLC TO DESIGN A PUMP STATION AT LUTZ RESERVOIR FOR THE CONTRACT AMOUNT OF FIVE HUNDRED SEVENTY-EIGHT THOUSAND THREE HUNDRED TWENTY-SEVEN DOLLARS ($578,327.00) AND AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE THE CONTRACT ON BEHALF OF THE CITY
Attachments: 1. Resolution - JR Engineering (Lutz Design)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Department of Utilities

Reference:  Lutz Non-Potable Reservoir Design Project

 

To:                                                               Mayor Gregory Mills and Members of City Council

Through:                                          Michael Martinez, City Manager

Prepared By:                                          Scott Olsen, Stormwater Coordinator

Date Prepared:                     July 14, 2022

PURPOSE
Requesting City Council’s consideration for the approval of the procurement of 22-007565 Lutz Reservoir Pump Station Design, to award a contract to JR Engineering, LLC, deemed the most responsive and responsible bidder of the one (1) response received from the posted solicitation and to approve the resolution giving the City Manager, or Designee, authority to sign the contract. Per City Code Section 3-8-90, “All materials, supplies, equipment, service and construction contracts, except as otherwise provided in this Article, with an estimated cost of greater than fifty thousand dollars ($50,000.00), shall be awarded through the formal bid process or the formal RFP process by the City Council. After due notice inviting bids, purchase orders and contracts shall be awarded to the lowest, most responsive and responsible bidder.”

 

STRATEGIC FOCUS AREAS

Financially Responsible

Supportive, Sustainable Infrastructure

 

BACKGROUND

Lutz Reservoir was planned as a water storage reservoir to provide non-potable irrigation to Prairie Center. An Agreement was previously brought to City Council on December 7, 2021 (Prairie Center Village V Development Agreement) that requires Prairie Center to deed Lutz Reservoir and the surrounding open space to the City by December 31, 2022. The City will design, construct and operate Lutz Reservoir as a non-potable reservoir to serve commercial development, parks and open spaces. Several improvements have already occurred at Lutz by others including a slurry wall and bank protection measures. This project will design the pump station and appurtenances to charge the existing non-potable waterlines with non-potable water for irrigation. The City has also applied to several funding opportunities to assist with the future construction costs.  

FINANCIAL IMPACT

Sufficient appropriation exists for the project in the 2022 budget.

 

STAFF RECOMMENDATION

Staff recommends that the City Council award the project to JR Engineering, LLC in an amount not to exceed $578,326.95.

 

OPTIONS FOR COUNCIL CONSIDERATION

Ø                     Approval as presented

Ø                     Reject

Ø                     Request that new proposals be submitted

 